arücke. Nr 1.2. and 3 of that Report,
istimated at $ 1934 for labour, the : measuring 137/2 yards in length, and
being
Stone Drains under the Reads
estimated at $ 876.94 additional, per estimate No tof 1845. - a small quantity of work is yet required to complete these Roads, viz: grassing. slopes and the formation of side channels Ve, which will be executed: previous to the
the
Zainy
season.
The
Harbour Master's Wharf
and
d pier, Report
and Estimate Nr. 3 of 1844, was completed.
during
the
year last,
· past, and has ....
proved of great benefit and convenience to the community at large, it being accessible at all times of the tide, and
the only Public landing
is moreover
place at
- present in the Toron ; it
sustained no
damage during the year = The storm of the 7th of May carried away a portion of the (Bridge
which
137
Spans the Nullah at the North- Barractis as I anticipated, and as
detailed in my Report of the preceding year. This was Repaired by the Royal Engineer's Departinent; and the amount £ 109: 10: 8,
charged against the Colony. -
The Construction of a
Bridge 25 feet Span, Report and Estimate Nr. 6, is postponed until further orders, or
contil after the next tainy it would be dangerous
season, at
and difficult
to erect it during that time, as
the centering
would be liable to be carried away by the fresh sets during
execution of the work.
the
The portion of the Queen's Read in this District has lately been
put into good repair, and
Shope
sufficient to secure its preservation, the expenditure thereon being of sod 1. 20.
(£.91.18.4.).
Some additional works were
Requisite